Colmore ME
Colmore ME
  • Home
  • About Us
  • SERVICES
    • Subcontracting
    • Main Contracting
    • Consulting Services
    • Air Handling Units
    • HVAC Contracting
    • Pipework Services
  • Contact Us
  • Sustainability
  • PROJECTS
    • CAT A Office Fit OUt
    • CAT B Office Fit Out
    • Higher Education
  • More
    • Home
    • About Us
    • SERVICES
      • Subcontracting
      • Main Contracting
      • Consulting Services
      • Air Handling Units
      • HVAC Contracting
      • Pipework Services
    • Contact Us
    • Sustainability
    • PROJECTS
      • CAT A Office Fit OUt
      • CAT B Office Fit Out
      • Higher Education
  • Home
  • About Us
  • SERVICES
    • Subcontracting
    • Main Contracting
    • Consulting Services
    • Air Handling Units
    • HVAC Contracting
    • Pipework Services
  • Contact Us
  • Sustainability
  • PROJECTS
    • CAT A Office Fit OUt
    • CAT B Office Fit Out
    • Higher Education

HIGHER EDUCATION

Coventry College – COFA Courtyard

Client: Inside Limited
Scope:  Full M&E Installation
Sector:  Higher Education 


Project Overview

 The team delivered the full mechanical and electrical installation for the new Centre of Performing Arts (COFA) Courtyard at Coventry College.


The project formed part of the college’s wider campus redevelopment, transforming an underused space into a modern, multi-purpose learning and collaboration area designed to support creative and digital studies. 


Delivery Highlights


 Working under Inside Limited, the team provided a complete M&E package that included:

  • Mechanical ventilation, heating and cooling systems with exposed ductwork and fan coil units
  • Lighting, small power and containment systems designed around flexible teaching and breakout zones
  • Domestic water, drainage and sanitary installations
  • Fire alarm and data systems integrated with the existing campus network
  • Coordination with the architectural team to preserve the open ceiling aesthetic and maximise natural light from new rooflights
     

The works were delivered within a live college environment, with careful phasing to ensure student safety and minimal disruption to ongoing teaching.
 

Outcome

The completed COFA Courtyard provides Coventry College with a bright, energy-efficient and inspiring learning environment that supports collaboration and creativity.


Delivered on programme and to specification, the new M&E systems ensure long-term comfort, reliability, and operational efficiency for both staff and students.

Contact Us

Colmore M&E Limited, 18 Bennetts Hill, Birmingham, B2 5QJ,  Registered Office, 15 Stadium Business Court, Bletchely, MK11EX - Company Number 16741104 -  Copyright © 2025 Colmore ME - All Rights Reserved.

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

DeclineAccept